Sunday, November 04, 2007

Lego 6

Day 2 started early in the morning I couldnt resist.


Here the small motors have been mounted. One for the front Dozer blade and one for the rear ripper.


A bit further on and the 2 recievers are mounted and connected to all 4 motors.


A little more into the book and now the battery box is mounted. This is built in well. A couple of pins hold it in. It can be taken in and out easily to replace batteries if needed. The ripper needs to be lowered over the edge of a table to give enough clearance.

Posted by Picasa

No comments: